3. Turn a free path into motion the robot can follow

Before: planning foundations and actuator dynamics. After: grasp and object-level success. Build: reject a collision between free endpoints, time a segment, and detect a tracking error that invalidates a nominally free route.

A path, a trajectory, and an execution are different evidence

A path describes configurations without assigning time. A trajectory specifies configuration and motion over time. An execution is what the robot actually did. The same path can be executed slowly, too fast for its actuators, or with enough tracking error to hit an obstacle.

For a manipulator, collision checks must consider every link, attached object, and relevant self-collision pair over the motion. An end-effector point is not a complete arm model. Our exercise uses a disk translating in a 2-D map, so it can check a swept region analytically while keeping these limits visible.

The gap between free endpoints

A robot disk of radius 0.1 m moves from (-1,0) to (1,0). A circular obstacle of radius 0.2 m is centered at (0,0). Both endpoints are clear, but the straight motion passes through the obstacle.

Find the closest point on the segment to the obstacle center. With start a, end b, center c, and direction d=b-a:

fraction = clamp(dot(c-a, d) / dot(d,d), 0, 1)
closest = a + fraction × d
clearance = distance(closest,c) - obstacle_radius - robot_radius - margin

If the segment has zero length, use its single endpoint. A clearance of zero is contact and is treated as blocked here. For the straight crossing, closest point is (0,0) and clearance is −0.3 m.

The detour (-1,0) -> (-1,0.6) -> (1,0.6) -> (1,0) has segment clearances 0.7, 0.3, 0.7 m for the specified disk and obstacle. This is an exact geometric calculation for these shapes, not a statement about a real map's accuracy.

Self-check: why clamp the fraction? Answer: without clamping, you find the closest point on the infinite line. An obstacle behind the start could appear closer than every point on the actual segment.

Timing must satisfy the motion's derivatives

Passing a sharp corner at nonzero speed changes velocity direction instantly in an ideal piecewise-linear path. That would require unbounded acceleration. One simple teaching schedule stops at each waypoint and uses a cubic blend for each straight segment:

s = t / T,    0 <= s <= 1
h(s) = 3s² - 2s³
position(t) = start + h(s) × (end-start)

Velocity is zero at both endpoints. Differentiate the blend:

h_dot = (6s - 6s²) / T
h_ddot = (6 - 12s) / T²

peak speed = 1.5 × segment_length / T
peak acceleration magnitude = 6 × segment_length / T²

For speed limit v_max and acceleration limit a_max, this particular cubic therefore requires:

T >= max(1.5 × length / v_max, sqrt(6 × length / a_max))

For a one-metre segment, v_max=0.5 m/s, and a_max=1 m/s², choose T=3 s. Peak speed is 0.5 m/s; peak acceleration is about 0.6667 m/s². This is the minimum duration for the chosen cubic under those bounds, not the globally time-optimal trajectory among every possible profile.

The Modern Robotics time-scaling lesson connects geometric paths to polynomial timing. A cubic's endpoint acceleration is nonzero. Joining segments can create acceleration jumps and does not impose a jerk bound. More demanding drives need a suitable higher-order or bounded-jerk profile, followed by checks against joint torque and other physical limits.

Check the interpolated motion after processing

The cubic above remains on exactly the same straight segment because h(s) increases from zero to one. Its disk collision result therefore carries over under the model. A different smoothing or interpolation operation may change the geometric path. Recheck the resulting motion rather than assuming the original waypoint clearance still applies.

In a production stack, distinguish planner output, time parameterization, controller interpolation, and measured feedback. Consult the selected MoveIt release's time-parameterization documentation and controller configuration; this lab does not execute those APIs.

Planned clearance must cover actual errors

The horizontal detour is at y=0.6 m with 0.3 m geometric clearance. If the actual reference point drifts to y=0.25 m, clearance becomes 0.25−0.2−0.1=−0.05 m: the observed motion collides despite the valid nominal path.

An inflation margin can account for a declared bound on tracking and map error, but the bound itself needs evidence. The maximum error in a few recorded trials is not a guarantee for every future disturbance. Correlated localization errors, stale maps, moving obstacles, and unmodeled geometry require additional treatment.

During execution, compare the measured state with the timed reference, not just the nearest waypoint. Record tracking error, command age, limit violations, and progress. If execution is invalidated, the controller needs a specified stopping or recovery trajectory with its own dynamics and collision checks. Setting velocity to zero in a message does not make a moving physical robot stop instantly.

Exercise and transfer

Run python3 labs/control_lab.py motion from this course directory. Inspect segment_clearance, cubic_duration, and cubic_sample in task_execution.py.

Guided variation: halve the speed limit while retaining the acceleration limit. Predict the duration before computing it. For the one-metre example, the speed term becomes 6 s, which dominates the unchanged acceleration term. The geometry stays the same; timing changes.

Independent transfer: implement the quintic blend 10s³−15s⁴+6s⁵, which has zero endpoint velocity and acceleration. Differentiate it, find its peak speed and acceleration, and select a duration under the same limits. Compare the two profiles using equal endpoints and declared timing. Do not compare arbitrary durations and attribute the result only to polynomial degree.

Exit artifact: a free-endpoint/colliding-segment example, one hand-derived duration, and a trace or synthetic case where actual tracking invalidates the plan. Explain which checks would need full robot geometry and real feedback.